Skip to content
ValmaDesign-build remodeling

Typically 10 to 12 weeks on site

Kitchens

Moving walls, plumbing and electrical so the room works, not just refacing the doors.

Most kitchens we are called about are not worn out. They are laid out for a house that no longer exists - a wall where the family now gathers, an island you cannot walk around with a tray, a pantry three steps too far from the range.

We start by drawing the room you actually use. Then we work out what it costs to get there, and tell you before you have spent anything on cabinetry.

What that includes

  • Layout and elevation drawings
  • Cabinetry, counters and tile selection
  • Plumbing and electrical relocation
  • Appliance fit and ventilation
  • Permit drawings and inspections

Kitchens we have built

Tell us what the room is doing wrong.

An hour at your house, measurements taken, and a straight answer about what it costs.