Skip to content
ValmaDesign-build remodeling

Charlotte, NC, 2024 — Kitchen

A kitchen that had to fit through a service elevator

An eleventh-floor renovation where the building's rules set the schedule and every cabinet had to arrive in pieces.

The finished kitchen with pale cabinetry and a stone worktop

Before

After

Drag the handle to compare.

Uptown condo work is a different trade. Association hours, elevator bookings and noise windows decided what could happen on any given day.

We specified cabinetry that could be assembled on site and staged deliveries to the building's calendar, which kept the job to its original completion date.

On site
10 weeks
Scope
  • Association coordination
  • Flat-pack cabinetry
  • Electrical upgrade
  • Flooring