
Matthews, NC, 2024 — Addition
Typically 4 to 6 months on site
New square footage that reads as part of the original house, not bolted to the side of it.
Additions live or die on the join. Get the roofline, the floor height and the window rhythm right and nobody can tell where the old house stops.
We handle survey, structural engineering and zoning review before a shovel goes in the ground, because that is where addition projects actually get delayed.
An hour at your house, measurements taken, and a straight answer about what it costs.