Skip to content
ValmaDesign-build remodeling

Typically 4 to 6 months on site

Additions

New square footage that reads as part of the original house, not bolted to the side of it.

Additions live or die on the join. Get the roofline, the floor height and the window rhythm right and nobody can tell where the old house stops.

We handle survey, structural engineering and zoning review before a shovel goes in the ground, because that is where addition projects actually get delayed.

What that includes

  • Survey and zoning review
  • Structural engineering
  • Foundation and framing
  • Roof tie-in and exterior match
  • Full interior finish

Additions we have built

Tell us what the room is doing wrong.

An hour at your house, measurements taken, and a straight answer about what it costs.